Welcome to Industrysourcing.com!

logoTille
中文 中文

Login/Register

WeChat

For more information, follow us on WeChat

Connect

For more information, contact us on WeChat

Email

You can contact us info@ringiertrade.com

Phone

Contact Us

86-21 6289-5533 x 269

Suggestions or Comments

86-20 2885 5256

Top

Evonik CDT plant passes performance test

Source:Evonik Release Date:2013-02-27 311
Plastics & Rubber
Evonik is producing CDT and polyamide 12 without any limitations.

As recently as ten months after the fire in Evonik Industries’ cyclododecatriene (CDT) plant, CDT-based VESTAMID? products and its precursors are available once again without limitations, thus force majeure ceased.  

After the reconstructed plant resumed operations at the Marl site in December, it demonstrated in early February how well it can run under normal operating conditions. This was done by subjecting the plant to a 72-hour test at full capacity. The VESTAMID? grades based on CDT as a raw material are thus available again in full quantities. 

“With a construction period of only six months, we’ve succeeded in minimizing the fallout time for CDT as much as possible after the plant explosion and fire;” says Gregor Hetzke, president of the Performance Polymers Business Unit, looking back at the successful efforts of the past year.  

Reconstruction to the CDT plant was begun in June, followed by its mechanical completion in November. 

CDT is a raw material for producing premium plastics, above all, polyamide 12, which is used by the automobile industry, for example.

 

 

 

Air Max 90 Fireflies

You May Like