iConnectHub

Login/Register

WeChat

For more information, follow us on WeChat

Connect

For more information, contact us on WeChat

Email

You can contact us info@ringiertrade.com

Phone

Contact Us

86-21 6289-5533 x 269

Suggestions or Comments

86-20 2885 5256

Top

ringier-盛鈺精機有限公司

Wind turbine maker earns 26 MW project in South Korea

Source:Ringier Metalworking Release Date:2015-07-20 124
Metalworking
The order was placed by one of the largest South Korean conglomerates which has been active in the wind power industry as a project developer and EPC contractor.

Vestas receives firm and unconditional order for 13 V100-2.0 MW turbines for a wind power plant in South Korea’s northeastern Gangwon Province. These will be Vestas’ first V100 wind turbines in the country. 

“South Korea is an increasingly attractive wind energy market as the country continues diversifying its energy mix to reduce its dependence on nuclear power and imported fossil fuels. We are able to help maximise the customer’s return on investment by offering a competitive cost of energy”, says Danny Nielsen, Head of Vestas Pan-Asia.

Delivery and commissioning are expected during the second half of 2016. Vestas will be responsible for the supply and installation of the wind turbines.

The project, with an expected annual power production of 76.6 GWh, includes a 10-year Active Output Management (AOM) 4000 service contract, in which Vestas guarantees a defined level of availability and performance. The project also includes SCADA Vestas Business Online for data-driven monitoring and preventive maintenance.

Vestas has an installed capacity of 226 MW in South Korea, accounting for about half of the total wind energy capacity in the country.

Adidas Performance
You May Like